• Location: Boydton, Virginia
  • Size: 124.4 MW
  • Budget: $1,999,650
  • Project: BN9-BN13, Acceptance Testing
Description: EPS performed NETA acceptance testing for the BN9-13 data center facilities, utilizing two teams of technicians. One team covered NETA testing of all MV equipment on site and another team tested LV equipment at a local fabrication facility where electrical distribution equipment was staged and shipped to site for final installation. A thorough review of all protective device settings was performed during the closeout of the LV 4 commissioning process adhering to the manufacturer coordination study.